← All work
Master Plans & Municipal GIS

Rawd Al-Jawa Municipal Investment Site: AutoCAD Regulatory Plan

Redrew an old scanned municipal map as an accurate AutoCAD regulatory plan for a 5,000 m² commercial investment site in Rawd Al-Jawa, prepared for preliminary approval by the Al-Qassim Region Municipality.

Location
Rawd Al-Jawa, Uyun Al Jawa, Al-Qassim, Saudi Arabia
Year
2024–2026
Client
Municipality of Uyun Al Jawa · Al-Qassim Region Municipality (Amanah)
Tools
AutoCAD 2023, Scanned-map digitising, Google Earth, Cadastral drafting
Preliminary-approval regulatory plan of the Rawd Al-Jawa investment site, drafted in AutoCAD from an old scanned map (1:500)
Fig. 1 Preliminary-approval regulatory plan of the Rawd Al-Jawa investment site, drafted in AutoCAD from an old scanned map (1:500)

Challenge

The municipality's only record of the site was an old scanned paper map. It needed an accurate, dimensioned plan drawn to the Al-Qassim Region Municipality's standard so the plot could go forward for preliminary approval as a municipal investment site.

Approach

  1. Brought the scanned map into AutoCAD and redrew the plot boundary to scale
  2. Drafted the ownership line and the regulation line, and divided the site into the proposed investment plot (Th 1) and a garden area
  3. Dimensioned every boundary segment (for example 65.03 m, 79.73 m, 61.96 m, 47.15 m, 25.19 m) and the control diagonals, and calculated the area
  4. Added the surrounding context: the existing 20 m street, the 10 m walkway and the neighbouring existing property
  5. Added location insets from Google Earth imagery, the north arrow, a 1:500 scale bar, legend and site statistics table
  6. Completed the Amanah title block, land-use and phase fields, approval notes and the hydrological study recommendations

Results

  • Proposed municipal-investment site (Th 1): 5,000 m², commercial use, phase 1445 AH, with a garden area in the northern corner
  • Bounded by an existing 20 m street to the west and south-west and a 10 m walkway to the north-east
  • The hydrological study found no wadi channels or drainage courses through the site, so the whole area can be used
  • Recommendations shown on the plan: grade the site following the natural north-to-south slope, drain surface water south to the existing road, link to the adjoining road slopes, and design curbs at least 20 cm high
  • Issued as the preliminary-approval plan (مخطط الاعتماد الابتدائي) of the Planning and Government Land Allocation Department, Al-Qassim Region Municipality